{"id":13,"date":"2026-03-01T14:25:20","date_gmt":"2026-03-01T14:25:20","guid":{"rendered":"https:\/\/s-eeh.de\/?page_id=13"},"modified":"2026-05-11T08:02:48","modified_gmt":"2026-05-11T08:02:48","slug":"fassadensanierung","status":"publish","type":"page","link":"https:\/\/s-eeh.de\/en\/fassadensanierung\/","title":{"rendered":"Serial Fa\u00e7ade Retrofit"},"content":{"rendered":"<h2 class=\"wp-block-heading\">Introduction<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Renovation without months of construction disruption.<br>SEEH delivers prefabricated facade elements with minimal impact on residents, users and public spaces.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Prefabricated Instead of Scaffolded<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">While traditional facade renovations often block sidewalks for weeks and dominate urban spaces with scaffolding, SEEH elements are prefabricated in the factory and installed within short assembly windows.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">The Difference Compared to Conventional Methods<\/h4>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-cb0a7ccb wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h2 class=\"wp-block-heading\">Planning<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Digital building surveys and precise pre-planning of facade elements.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h2 class=\"wp-block-heading\">Production<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Industrial production of complete facade elements including insulation and exterior finishes.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h2 class=\"wp-block-heading\">On-site Assembly<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Fast installation with significantly reduced disruption for residents and traffic.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n<\/div>\n<\/div>\n\n\n\n<h4 class=\"wp-block-heading\">Advantages of Serial Facade Renovation<\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>minimal obstruction of sidewalks and public spaces<\/li>\n\n\n\n<li>significantly shorter construction periods<\/li>\n\n\n\n<li>predictable installation phases<\/li>\n\n\n\n<li>reduced noise disturbance for residents<\/li>\n\n\n\n<li>improved energy performance of the building envelope<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\">Renovation as the Basis for Vertical Extension<\/h4>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Through system-based planning, facade renovation and modular vertical extension can be combined.<br>Energy-efficient modernization and urban densification<br>are realized within one integrated process.<\/p>\n\n\n\n<div class=\"wp-block-columns alignwide is-layout-flex wp-container-core-columns-is-layout-1015f775 wp-block-columns-is-layout-flex\" style=\"padding-right:0;padding-left:0\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"818\" height=\"544\" src=\"https:\/\/s-eeh.de\/wp-content\/uploads\/2026\/03\/Screenshot-2026-03-02-161739.png\" alt=\"\" class=\"wp-image-194\" style=\"width:700px\" srcset=\"https:\/\/s-eeh.de\/wp-content\/uploads\/2026\/03\/Screenshot-2026-03-02-161739.png 818w, https:\/\/s-eeh.de\/wp-content\/uploads\/2026\/03\/Screenshot-2026-03-02-161739-300x200.png 300w, https:\/\/s-eeh.de\/wp-content\/uploads\/2026\/03\/Screenshot-2026-03-02-161739-768x511.png 768w\" sizes=\"auto, (max-width: 818px) 100vw, 818px\" \/><figcaption class=\"wp-element-caption\">Installation process<\/figcaption><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"814\" height=\"545\" src=\"https:\/\/s-eeh.de\/wp-content\/uploads\/2026\/03\/Screenshot-2026-03-02-161758.png\" alt=\"\" class=\"wp-image-195\" style=\"width:700px\" srcset=\"https:\/\/s-eeh.de\/wp-content\/uploads\/2026\/03\/Screenshot-2026-03-02-161758.png 814w, https:\/\/s-eeh.de\/wp-content\/uploads\/2026\/03\/Screenshot-2026-03-02-161758-300x201.png 300w, https:\/\/s-eeh.de\/wp-content\/uploads\/2026\/03\/Screenshot-2026-03-02-161758-768x514.png 768w\" sizes=\"auto, (max-width: 814px) 100vw, 814px\" \/><figcaption class=\"wp-element-caption\">Final result<\/figcaption><\/figure>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-c0bc9f7e wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\">Evaluate Renovation Project<\/a><\/div>\n<\/div>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>","protected":false},"excerpt":{"rendered":"<p>Einstieg Sanieren ohne monatelange Baustelle.SEEH realisiert vorgefertigte Fassadenelemente mit minimaler Beeintr\u00e4chtigung f\u00fcr Bewohner, Nutzer und \u00f6ffentlichen Raum. Vorgefertigt statt einger\u00fcstet W\u00e4hrend klassische Fassadensanierungen \u00fcber Wochen Gehwege blockieren und Ger\u00fcste den Stadtraum dominieren, werden SEEH-Elemente im Werk vorgefertigt und in kurzen Montagefenstern installiert. Der Unterschied zum klassischen Verfahren Planung Digitale Bestandsaufnahme und pr\u00e4zise Vorfertigung der Fassadenelemente. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"page-with-title","meta":{"footnotes":""},"class_list":["post-13","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/s-eeh.de\/en\/wp-json\/wp\/v2\/pages\/13","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/s-eeh.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/s-eeh.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/s-eeh.de\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/s-eeh.de\/en\/wp-json\/wp\/v2\/comments?post=13"}],"version-history":[{"count":11,"href":"https:\/\/s-eeh.de\/en\/wp-json\/wp\/v2\/pages\/13\/revisions"}],"predecessor-version":[{"id":661,"href":"https:\/\/s-eeh.de\/en\/wp-json\/wp\/v2\/pages\/13\/revisions\/661"}],"wp:attachment":[{"href":"https:\/\/s-eeh.de\/en\/wp-json\/wp\/v2\/media?parent=13"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}